Defect Management

The defect lifecycle — from discovery to closure — and how to manage it well.

By SixQuality · Software Testing

Finding a defect is only the beginning. Defect management is the process of recording, triaging, fixing, verifying, and closing defects in a controlled way so nothing slips through the cracks.

The defect lifecycle

A typical defect lifecycle

New
→
Assigned
→
Open / In progress
→
Fixed
→
Retest
→
Closed

A defect may also be rejected (not a genuine bug), deferred (fixed later), or reopened if a fix fails retesting.

Anatomy of a good defect report

Severity vs priority: severity is how bad the defect is; priority is how soon it should be fixed. A minor typo on the home page can be low severity but high priority.

Conclusion

Defect management ensures every issue is tracked from discovery to resolution. A clear lifecycle and well-written reports mean defects get fixed faster, verified properly, and never quietly lost.

Next: Testing Training & Certification →

← Back to all articles